Time for another Update. I have bolded what projects are finished, Items in Italics have been started, the plain ones are left. I have also added some that I left off below
1. Move Kitchen Door2. Remove Kitchen / Dining Room Wall3. Remove Half Wall4. Remove Flooring in Kitchen5. Install Bathroom Fan6. Install New Sump Pump Pit7. Fix Basement Floor (Filled Drilled Holes, only Crack repair left)8. Remove Carpet in Living Room9. Patch Hardwood Below Carpet10. Paint Walls (90%)11. Install HD OTA Antenna (www.antennaweb.org)12. Replace Drywall Where Needed (99%)13. Install Kitchen Floor14. Install Kitchen Cabinets (99%)15. Install Attice Soffit Vents
16. Install Attic Ladder17. Install Peg board behind work bench (80%)
18. Fix Sink in basement, install sink basin pump.
19. Install Countertop(95%) (www.bedrockcreations.net)
20. Refinish Hardwood Floors
21. Install Sump Pump Battery Backup (www.basementwatchdog.com)22. Install Cabinet Soffits and Microwave Vent.